
Est. 2000 · Australian family-owned
Equestrian Land Developments
Specialising in the Design and Construction of Quality Equestrian Facilities.
- 25+ yrs
- Building arenas since 2000
- ~1 / week
- Arenas built on average
- 3–4 days
- Typical full-spec build – ride immediately
- 100% natural
- Manufactured sand surfaces, no synthetics
About ELD
Born from a simple request. Built one arena a week, for over 25 years.
Equestrian Land Developments was born when a family friend needed a custom-built equestrian arena. From that first project the ELD Spec. Arena was created, and in 2000 Equestrian Land Developments Pty Ltd was officially established.

Founder & Director Todd Cunningham grew up on a property with spelling stables for over 120 horses and spent his career in earthmoving and construction – combining horse knowledge with precision earthworks on every project.

What we build
Arenas and facilities for every discipline
Dressage, show jumping, Western, competition and indoor arenas, polo fields, round yards and walker pads – plus property layout, earthworks and arena rebuild & restoration.
The ELD Full Spec. Arena
Engineered from the ground up
Todd Cunningham designed the first ELD Full Spec. Arena in early 2000 and, to this day, the design has proven successful and long lasting. Todd personally oversees every arena project.
- Two engineered base layers
- ELD natural manufactured sand surface
- Sleeper surrounds
- Earthworks included
- Generally built in 3–4 days, ready to ride immediately

Environmental sustainability
Natural surfaces. Healthier horses. Lighter footprint.
ELD has made a clear commitment to move away from synthetic additives in all arena surfaces – no microplastics, no fibre top-ups, no costly end-of-life removal. We exclusively use our own Australian-manufactured sand surfaces, suited to Australia's climate.
We contribute a portion of revenue to organisations such as Sea Shepherd, Greenfleet, OzHarvest and The Great Barrier Reef Foundation – and planted a little over 600 trees on our home property by the end of 2021.
Arena Shop
Arena maintenance made easy
The ELD Arena Spread-a-bar® is engineered to retain the depth of your surface – a flat edge on one side, 30mm harrows on the other, and no wheels to cause corrugations. Designed by Todd Cunningham and made in Australia.
Trusted by
Clubs, councils, venues and riders
Queensland State Equestrian Centre (QSEC), Moreton Bay Region
Kolora Lodge
Andrew Cooper Eventing
Larapinta Equestrian
Elysian Fields
Rivergum Park Agistment and Equestrian Centre
Brookfield Horse and Pony Club
Brookfield Show Society
Crestline Equestrian
RDA Samford
Cherbon Waters Equestrian Centre
Arundel Park Riding for Disabled Inc (APRDA)
GT Sporthorses
Sunshine Coast Council
SPC Equestrian Centre
City of Gold Coast
Kilkivan Showgrounds and Equestrian Centre (KSEC)
Boonah Show Society
Nicole Tough Dressage Team
Darra Oxley Pony Club
News
Latest from ELD
Equitana 2024
Todd Cunningham will be at Equitana 2024 in Melbourne appearing as an educator. Discussing Arena Construction. Two Days Only!
Read more
ELD / TCP Projects
Joint Venture Equestrian Construction Projects between Equestrian Land Developments Pty Ltd and Todd Cunningham Projects Pty Ltd.
Read more
2023 January – June
Equestrian Arena Constructions by Equestrian Land Developments from January to June 2023. Dressage, Reining, Showjumping, Indoor Arena Construction.
Read moreHow much does an ELD arena cost?
A full-spec ELD 20m x 60m arena is $70,000 – $80,000 + GST and a 20m x 40m arena is $60,000 – $70,000 + GST (current pricing as at 01/08/2025, subject to change). Pricing varies based on earthworks, property location and site requirements. See consultation & quotation.
How long does it take to build an arena?
Construction of a full-spec ELD arena is generally completed in 3–4 days, and the arena is ready to ride immediately.
What is included in a full-spec ELD arena?
Two engineered base layers, the ELD surface, sleeper surrounds and earthworks. Todd Cunningham personally oversees every arena project.
Do you use synthetic arena surfaces?
No. ELD has made a clear commitment to move away from synthetic additives in all arena surfaces because of concerns around microfibres, microplastics, toxins leaching into soil and waterways, heat absorption and end-of-life removal costs. ELD exclusively uses its own natural manufactured sand surfaces. Read more.
Where is ELD based and which areas do you service?
ELD is based in South East Queensland (postal address: PO Box 98, Cooroy QLD 4563). Arena constructions have been completed across Queensland and New South Wales, and Todd has overseen projects in Australia and abroad. Arena maintenance visits currently service SE QLD and Northern NSW.
Start your project
Talk to Todd about your arena
Onsite consultations, quotations and pre-purchase inspections across South East Queensland and surrounding areas.








